Blodgett DFG-100 XCel Specifications Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 97
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
Installation
6
Oven Assembly
DOUBLE SECTION ASSEMBLY
1. Secure the short legs to the bottom sections
as described.
2. Attach lower flue box to lower oven.
3. Place the upper section in position on top of
the lower oven.
4. Attach the stacking brackets using the reĆ
maining 5/16" bolts shipped with the ovens.
5. Install flue riser and attach upper flue box to
upper oven.
WARNING!!
When stacking ovens be sure to remove
the single oven flue boxes prior to attachĆ
ing upper and lower boxes and riser.
OVEN LEVELING
After assembly, the oven should be leveled and
moved to the operating location.
1. The oven can be leveled by adjusting the feet
or casters located on the bottom of each leg.
Flue Riser
Flue
Boxes
Figure 6
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 96 97

Comments to this Manuals

No comments